Road condition monitoring for Public Works
Itsgraded uses cameras already installed on government vehicles to identify and map road damage during their normal routes, eliminating dedicated survey contracts. It finds potholes, cracks and pavement deformation on every road your vehicles drive.
Video: a dashcam drive with boxes drawn around road damage, then a road map that fills in block by block, material reports and a ranked repair plan.
Benefits
- Your own vehicles cover the roads during their normal routes, so your department needs no dedicated survey contracts.
- Itsgraded uses the dashcams and reverse cameras already installed on your vehicles, and your drivers do nothing new.
- Every pass over a road updates the map, so the condition of each block stays current.
- The demo and the installation on your vehicles are free.
Dashcams and reverse cameras
Itsgraded maps road damage from the footage your dashcams and reverse cameras record. There is nothing for the driver to do. After one import of the footage, Itsgraded runs every step on its own, from damage detection to the repair plan.
Itsgraded hardware
Police SUVs and fleet pickups
Damage detection
Road-OCR, the Itsgraded detector, checks every frame of the footage and marks potholes, longitudinal cracks, transverse cracks and alligator cracking. Each mark keeps the time, position and heading of its frame. Road-OCR merges the frames of one pass, so each defect counts once. It also checks the centerline in every frame and flags the frames where the paint has faded.
A reviewer checks each finding against its image before it goes into a report. This is the first finding from the Peoria trial:
- Defect type
- Transverse crack
- Captured
- 2017-12-11 18:14:03 UTC
- Position
- 40.73976 N, 89.64892 W
- Sightings
- 4, merged into one finding
Road condition map
Itsgraded places each frame on its block of your road inventory, and the map fills in as the vehicle drives. Itsgraded colors each block by its wear index and marks in gray the blocks the camera saw poorly or never saw.
Wear index
- 0 to 10
- 10 to 25
- 25 to 50
- 50 to 75
- 75 to 100
Coverage
- Seen, under 80 percent
- Never observed
Also shown
- Camera frame
- Last pavement survey rating
Selected block
- Wear index
- 100
- Findings
- 14 over 134 m assessed
- Potholes
- 1
- Longitudinal cracks
- 4
- Transverse cracks
- 5
- Alligator cracking
- 4
- Coverage
- 87 percent
- Traffic
- 34,000 vehicles a day
- Surface
- Asphalt over continuously reinforced concrete, resurfaced 2020
- Repair plan
- Rank 1, patch crew, day 1
The wear index counts findings per assessed kilometer. Each pothole counts four times and alligator cracking counts twice. The index stops at 100.
Every finding in a survey links back to the camera frame it came from, and every survey exports as CSV or GeoJSON.
Material reports
Itsgraded compares wear across the surface materials of your road inventory, using the material, surface year and daily traffic of every block. A second pass over the same block shows how fast it wears, and Itsgraded groups those wear rates by material and traffic. Each report sets the wear beside the freeze-thaw days of every winter at the nearest weather station.
Winter exposure
- Weather station
- Peoria airport, USW00014842
- Year of the footage
- 2017, with 63 freeze-thaw days
- Most, 2016 to 2025
- 99, in 2018
- Fewest, 2016 to 2025
- 55, in 2024
- 2026 through October 28
- 36
A freeze-thaw day has a low below 32 °F and a high above 32 °F: water in the cracks freezes overnight and thaws by day.
The records of every road sit beside its blocks: pavement survey ratings, bid prices, scheduled work, specifications, plan sheets, policies and project proposals, each linked to its source document.
Repair coordinator
Itsgraded ranks the blocks by wear index, then traffic, then road class, so arterial and primary roads come before residential streets. Potholes and alligator cracking go to a patch crew and linear cracks to a crack seal crew. The suggested week fills each crew's days to its daily capacity, and a route map shows where each crew works.
Peoria trial plan
- Patch crew 1
- 8 blocks, 3 a day
- Crack seal crew
- 4 blocks, 4 a day
- Suggested week
- 12 blocks over 3 days
- First block
- Wear index 100, arterial, 34,000 vehicles a day, patch crew on day 1
A coordinator approves the plan before the crews go out. The plan exports as CSV, with the supporting evidence for every block.
The Peoria trial holds the full dashboard: the dashcam footage, the road map, the material reports and the repair coordinator.
Open the Peoria trialFree footage test
Send us a recording from any of your vehicles. We map the road damage in it at no cost and walk your staff through every finding. Your footage stays private and protected at every step, under a written agreement with your department.
Security and privacy
- A written agreement with your department before any footage moves
- Your department picks the recordings, the people who see them and where they are processed
- Footage protected while it is transferred, stored and processed
- Footage used only for your test and deleted on the schedule in your agreement
- Police footage handled under your department's evidence rules
- No footage on this website, in its analytics or in its logs
Your department receives
- A damage map of every road in the recording
- The camera frame behind each finding
- A CSV and GeoJSON export
- A walkthrough of the findings with your staff